
- Solidworks Vault Install The SOLIDWORKS#
- Solidworks Vault Download The Parasolid#
- Solidworks Vault Update This Board#
Solidworks Vault Install The SOLIDWORKS
Apply a rule for the DWMasterVersion property that results in the number of the revision to be used.When using separate Development and Production environments that require to be managed by SOLIDWORKS PDM, consider the following: Create and capture the Special Custom Property DWMasterVersion in each master model or drawing that requires a previous revision to be used. Once SOLIDWORKS PDM Client is installed on a machine, the next step is to create a Local Vault View which gives the users access to the PDM vault through Windows File Explorer. If you only have a few client machines, then creating the Local Vault Views using the View Setup wizard should only take a few minutes for each machine.DriveWorks will never prompt to check these files out of the vault before editing.Starting a Program 1 Click the Start button in SOLIDWORKS Certification Exam Guide & Practice Test installation guide solidworks pdm 2020/solidworks manage.solidworks pdm vault tune-up The PDM VAULT Tune-Up is designed to optimize performance and identify any red flags which can be addressed with preventative maintenance. With thousands of hours of SOLIDWORKS PDM experience, our professionals can bring you best practices in data security, configuration, and workflows.If revision control of the Group and Project files is required we recommend utilizing the Copy Group/ Pack and Go functionality in DriveWorks Data Management to manually create backup and restore points.Learn how to install the SOLIDWORKS Workgroup PDM Vault Administration tool for vault configuration.Quick Tip presented by Derrick Franklin of GoEngineer.See.Thus, you can either install SolidWorks and the Uploader application directly onto the server that hosts the Workgroup PDM vault or use another computer on your network that has direct file access to the vault data. Here are the steps to determine the location of your Vault Data.
For full details on what's needed, see MCAD Co-Designer: SOLIDWORKS®. Make a change to the board shape or the positioning of a critical component in Altium Designer, then click a button to pass those changes across to your fellow designer in SOLIDWORKS.Underlying these collaboration capabilities is an ECAD-MCAD Project Collaboration Server (or Altium Vault), storing the board shape, components and the designers' comments.Design changes are passed from Altium Designer transparently through the Collaboration Server/Vault to SOLIDWORKS, and back again.Before you can collaborate, ensure that you have fulfilled the requirements for collaboration. Now available as an add-in for SOLIDWORKS version 2018 and higher, CoDesigner supports: bi-directional transfer of complex board shapes with cutouts bi-directional transfer of placed components as 3D models MCAD to ECAD transfer of native components and support for rigid-flex PCBs.► Learn more about Altium's latest ECAD-MCAD CoDesign technologyToday's sophisticated electronic products come in all manner of unusual shapes and sizes - designing these products demands close collaboration between the mechanical and electronic design teams throughout the development process.Helping with this is the new MCAD Co-Designer: SOLIDWORKS® extension for Altium Designer, allowing the ecad and mcad designers to directly pass design changes back and forth between Altium Designer and SOLIDWORKS®. Altium continues to develop MCAD-to-ECAD CoDesign capabilities. Development content out of the vault and Production content in the vaultEither scenario introduces complexities for overwriting key Production files with the revised Development files. Msiexec /i 64-bitadminimagepathSOLIDWORKS.Shared Groups are SQL Server based and therefore have no physical file that can be controlled by SOLIDWORKS PDM.
Altium Designer - click the PCB button down the bottom right of the application and select Solidworks Collaboration from the menu. Notifications about incoming changes appear automatically in the Collaboration panel, as soon as a Push is performed on the other side. The designer working in each application uses the Collaboration panel to Push and Pull design changes from one application to the other.
As the board shape or a cutout, these shapes behave as regions in Altium Designer. Currently, spline and conic shapes are not fully supported, however it may be possible that the spline shape you create in SOLIDWORKS does transfer correctly to Altium Designer.Supported shapes can be used to define the board shape and/or board cutouts in SOLIDWORKS. There is a high level of support for these shape in Altium Designer, with slot, ellipse and parabolic shapes being supported.

Release these models to the \Mechatronic 3D Models\ folder in the Collaboration Server/Vault.The steps to collaborating from Altium Designer - click Push in the Collaboration panel, then Post a message to upload the shared elements (board shape and components).A managed project is not automatically available for collaboration, you must perform a Push in the Collaboration panel to save the required collaboration elements into the Collaboration Server/Vault.To then access this project from SOLIDWORKS: Create a Parasolid model file for the board and each component in the design, and store them in the \ SolidWorks Collaboration\Exported 3D Models\ folder in the working copy of the ecad project folder. You will be prompted to enter a comment, do this, then click the Post button to complete the push process, as shown in the images below. In the SOLIDWORKS Collaboration panel, click the Push button. Make the PCB the active document in Altium Designer.
The next step is to save the SOLIDWORKS assembly that will hold the board design on the SOLIDWORKS side. Here you are letting SOLIDWORKS know which managed project you want to open the board from, this step will fail if the board has not been Pushed in Altium Designer. Select the project from the list of managed projects, and click OK. The Select Project dialog will open, listing all of the managed projects in the Collaboration Server/Vault, that the current SOLIDWORKS user has permission to open. Click the Create from Repository button.
Solidworks Vault Download The Parasolid
Download the Parasolid component models into the \Temperature Sensor Electronic Parts\Downloaded Models\ mcad folder, Read the board shape from the the Collaboration Server/Vault and create a SOLIDWORKS assembly of it ( *.sldsam), Applying Component Change., and so on. The Altium SOLIDWORKS Collaboration dialog will then appear, showing the status of the various steps of the process: such as Pulling Design from Server.
create a board for an existing project by selecting the required managed project in the list, or The Select Project dialog will open, now you can either: Click the Create New Board Assembly button in the panel. In SOLIDWORKS, click the icon in the set of panel icons on the right of SOLIDWORKS to open the Altium Designer Collaboration panel. You can now reshape the board and move the components in SOLIDWORKS, Push those changes back into the Collaboration Server/Vault, and then Pull the PCB design into Altium Designer.Starting the Collaboration Process in SOLIDWORKSThe workflow can also commence in SOLIDWORKS and then move to Altium Designer if required.The approach to working in this direction is:
With the *.sldasm as the active document in SOLIDWORKS, the Altium Designer Collaboration panel will show the Pull and Push buttons, click Push to push the design into the Collaboration Server/Vault.You can now access this new board shape from Altium Designer: You will be presented with a default board shape in SOLIDWORKS, edit the shape as required, save it, and return to the assembly editor (note that SOLIDWORKS runs as multiple applications, you can be in the part editor or the assembly editor). Select/enter a suitable location and name, then Save the assembly. The Save As dialog will then open - ready to name the SOLIDWORKS assembly. The Repository setting is the repository used by the Collaboration Server/Vault to store managed projects, typically it will be set to the DefaultRepository, click OK and the dialogs will close. If you choose this option the Create New Server Project dialog will open, enter a suitable Name and Description for the project.
Solidworks Vault Update This Board
The next step will be to update this board based on the shape defined in SOLIDWORKS and Pushed to the Collaboration Server/Vault. Next you need to add a blank PCB to the project, select File » New » PCB, a new PCB will be added to the project and opened ready for editing. Select the required managed project in the list and click OK to open the project.
Right-click on the board in the Altium Designer Projects panel and select Save, giving the board file a suitable name. The board shape / cutouts will change to match the proposed purple shape. Enable the checkbox for the change(s) you wish to accept, and click the Accept button. Click the View Changes button, the panel will change to list all the changes detected, click on a change to view the change in the workspace, it will flash 3 times in purple. If it is not visible, open the SOLIDWORKS Collaboration panel, it will detect that there is a board active and flag that New changes have been detected!
